Pilot Plant Commissioning and Operations for Copper Sulfide In Situ Indirect Bioleaching

Theodore Ineich, Jan Kwak, Mark Damhuis, Bart Zaalberg, Doris Hiam-Galvez,Wickus Slabbert

The minerals, metals & materials series(2018)

引用 0|浏览0
暂无评分
摘要
The “BIOMOre” project aims to prove the technical feasibility of indirect in situ bioleaching of sulfide minerals contained in a deep underground deposit, by bringing together the disciplines required to make a success. The underground location in Poland was provided by project partner KGHM inside an operating copper mine. Key components of this project were the design and construction of a pilot plant, and its operation in an underground environment. This project also included a ~250 t (100 m3) fragmented rock reactor hydraulically connected to the pilot plant. The pilot plant consisted of several tanks and pumps, a fluidised bed ferric iron generating bioreactor containing immobilised acidophilic iron oxidation biomass, and all the required instrumentation and utilities. Before the bioleaching phase could start, the rock reactor had to be flushed continuously firstly with water to remove chloride salts that are corrosive and also harmful for the bacteria used in the bioreactor, and secondly, with sulfuric acid solution to react with the carbonates present in the ore matrix. This paper summarizes the design, construction, commissioning, and operation of the pilot plant.
更多
查看译文
关键词
Bioleaching, In situ, ISL, ISR, ISM, Copper, Sulfide, Chalcopyrite, Pilot plant, Hydrometallurgy
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要