Abstract In order to cope with the problem of renewable energy consumption, power plants in Northeast China need to carry out corresponding flexibility transformation to improve the peak peaking capacity of the unit. Among them, the transformation of the milling system is a key and difficult point in the whole process of transformation. This paper analyzes the possible problems caused by the transformation and proposes solutions by analyzing the 30% TRL milling system.