Reliability of phase mission linear consecutively-connected systems with constrained number of consecutive gaps

2016 International Conference on System Reliability and Science (ICSRS)(2016)

引用 1|浏览2
暂无评分
摘要
There are many linear consecutive connected systems with multi-phase missions, such as the modem water diversion system. In each phase, they can be treated as a linear consecutively-connected system (LCCS), and the whole system with multi-phase missions can be modelled as the phase mission linear consecutive connected system (PM-LCCS). With the development of bypass transportation system, every phase allows a limited number of consecutive disconnections betw een nodes which can also be referred as gaps. We generalized the traditional PM-LCCS model with the M consecutive gaps in each phase mission. In the proposed model, if the number of consecutive gaps in a phase mission exceeds the limitation M, the phase mission will fail; and the failure of any phase can cause the failure of the whole system A recursive algorithm is adopted to analyze the system reliability. At last, the proposed model is implemented by an illustrative example.
更多
查看译文
关键词
linear consecutive-connected system,phase mission,connection element,bypass transportation system,number of consecutive gaps
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要