Segmental Assembly Construction Of Double U-Shaped Light Rail Viaduct Bridge

Xingfa Wu,Hehui Zheng, Gangwei Zeng

2015 INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING AND ROCK ENGINEERING, ICCERE 2015(2015)

引用 0|浏览0
暂无评分
摘要
Shanghai light rail line 17 planning routes from Oriental oasis to Hongqiao railway station, Minhang district, including continuous girder bridge, a total of 20, adopt the method of cantilever assembly construction. Its cross section is a novel structure of double U, and using the method of short precast assembling, with high efficiency [4], for the first time, which is described in this paper, its construction and control is also declared.(1)
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要