Research And Application Of Bottleneck-Based Planning And Scheduling Method For Pcb Manufacturing System

2019 INTERNATIONAL CONFERENCE ON INTELLIGENT MANUFACTURING AND INTELLIGENT MATERIALS (2IM 2019)(2019)

引用 1|浏览3
暂无评分
摘要
Researches on planning and scheduling of PCB production system are gaining more and more attention due to the complexity and uncertainty of it. Current research focused on the solving method how to make better schedule solution for PCB system based on a real case of PCB production enterprise. Firstly, for the bottleneck process of electroplating, a mixed integer programming model is proposed, moreover, a branch and bound method is employed to solve the problem. Secondly, for non-critical processes, the man-hour quota is predicted using the neural network model and the association rules, and then the data can be found using the association rules and be modified. Thirdly, the planning and scheduling method based on bottleneck is used for the order sequencing, and "pull-push" mechanism of Drum-Buffer-Rope are applied to generate the scheduling scheme for non-bottlenecks. In the end, the effectiveness of the proposed scheduling method is proved by computational experiments.
更多
查看译文
关键词
pcb manufacturing system,scheduling method,planning,bottleneck-based
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要