The Fermilab Proton Improvement Plan II, or PIP-II, would enable the world's most intense high-energy neutrino beam and would help scientists search for rare particle physics processes. The PIP-II goal is to deliver 1.2 MW of proton beam power from the Fermilab Main Injector, over the energy range 60 - 120 GeV, at the start of operation of the LBNF/DUNE program. PIP-II provides a variety of upgrade paths to higher beam power from the Main Injector, as demanded by the neutrino science program and as recommended by the 2014 P5 report. Delivering more than 2 MW to the LBNF target in the future will require a replacement of the existing Booster. This report outlines a cost-effective Booster replacement option and an upgrade path for the Fermilab Accelerator Complex to attain 2.4-MW beam power on the LBNF target, as well as to retain the capability to provide 8-GeV proton beams to the existing Fermilab Muon Campus via the existing Recycler ring. Its cost-effectiveness is achieved by: (1) using a small-diameter metallic vacuum chamber in the Booster replacement and (2) reusing the existing Recycler ring. Reusing the Recycler ring may be of particular advantage since it is presently employed to deliver 8-GeV beams to the Muon Campus experiments. The present concept also retains such a capability.
更多
查看译文
关键词
fermilab accelerator complex,cost-effective
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要