Study on timing sequence control fracture blasting excavation of deep rock masses with filled joints

SCIENTIFIC REPORTS(2021)

引用 1|浏览0
暂无评分
摘要
During the blasting excavation of deep underground caverns, the effects of the structural surface on crack propagation are usually considered in addition to the clamping effects of high in situ stress. Based on the notched borehole and timing sequence control (TSC) fracture blasting method, this paper studies the effects of different borehole shapes on the degree of damage of the surrounding rock and profile flatness of the rock anchor beams and the effects of different filled joint characteristics on the blasting crack propagation rules. The results show that the damage depth of the surrounding rocks by round hole smooth blasting is approximately twice that by notched hole smooth blasting, by which the profile formed is flatter. The notched primary borehole (PBH) remains a strong guidance for crack propagation in a rock mass with filled joints, while the stress concentration effects of the round target borehole (TBH) cannot fully guide the cracks until they fall within a certain distance between the PBH and TBH. It is favourable for cracks to propagate along the lines between boreholes with larger filled joint strengths and larger angles between boreholes.
更多
查看译文
关键词
Civil engineering,Solid Earth sciences,Science,Humanities and Social Sciences,multidisciplinary
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要