Closed-Loop Scheduling In A Canned Food Factory

IFAC-PapersOnLine(2020)

引用 2|浏览2
暂无评分
摘要
This paper addresses the problem of closed-loop operation of scheduling, together with the interaction of control and scheduling, for a class of processes that appear very often in industry: those that combine continuous production lines with parallel batch units that share some resources. The paper presents a novel approach to this problem, including batching and a new type of precedence in the assignment problem. It also considers the effect of shared resources on the duration of the cycle time of the batch units. The approach is illustrated with a real-life example of a canned tuna factory Copyright (C) 2020 The Authors.
更多
查看译文
关键词
Integration of scheduling and control, shared resources, tuna cans sterilisation, process optimisation, continuous-batch process scheduling
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要