A Mixed Integer Programming Based Cut-Off Grade Model For Open-Pit Mining Of Complex Poly-Metallic Resources

RESOURCES POLICY(2021)

引用 3|浏览4
暂无评分
摘要
The mineral supply chain in an ideal open-pit mining operation constitutes a set of sequential stages including a surface mine or an open-pit, a processing plant and a refinery or market. Cut-off grade defines the flow of materials from the mine to subsequent stages within this mineral supply chain. This underlines the significance of cut-off grades in establishing the economic viability of an operation. However, only heuristic methods are available for defining the cut-off grade policy for complex mineral resources (orebodies) that constitute multiple economic minerals. This article proposes a new mixed integer programming based mathematical model that generates an optimal cut-off grade policy for open-pit mining operations that mine, process and refine or market multiple metal products. An implementation of the new method in three separate case studies reflects better performance (i.e., 24%, 36% and 27% higher net present value) against available heuristics.
更多
查看译文
关键词
OR in natural resources, Mineral resources, Open-pit mining, Optimization, Cut-off grade, Scheduling
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要