Review Of Solution Methodologies For Open Pit Mine Production Scheduling Problem

INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT(2021)

引用 15|浏览5
暂无评分
摘要
The open pit mine production scheduling problem determines a sequence of three-dimensional, notional block extraction that maximises net present value (NPV) of future cash flows and satisfies technical and operational constraints such as precedence between blocks and resource availability. Since the 1960s, researchers have developed a variety of mathematical models that address block extraction at the strategic, tactical and operational levels, and the complexities associated therewith, e.g. risk and uncertainty, inventory strategies, environmental concerns and downstream processing. Given that these mathematical models are computationally complex, i.e. they are generally categorised as NP hard, a significant portion of the literature is dedicated to the development and performance of solution approaches spanning from exact and heuristics to recent meta-heuristic methods. This paper provides a comprehensive overview of recent contributions (from 2012 to early 2019) and discusses proposed future studies.
更多
查看译文
关键词
Scheduling, open pit mining, exact methods, heuristic algorithms, meta-heuristic methods
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要