Hard-Rock Tunnel Lithology Prediction With Tbm Construction Big Data Using A Global-Attention-Mechanism-Based Lstm Network

AUTOMATION IN CONSTRUCTION(2021)

引用 61|浏览18
暂无评分
摘要
The TBM-constructed rock tunnel often suffers from low comparability of efficiency between geological condition detection and the TBM real-time operation requirements. This article developed a time-related intelligent model for tunnel lithology prediction using TBM construction big data with illustration by the Yinsong Water Diversion Project. The global attention mechanism based long-short-term-memory (LSTM) network was established to model the cyclic TBM construction data and make predictions of lithology at the tunnel face with 9 selected featuring input parameters. The established global-attention-mechanism-based LSTM network was found to predict well tunnel lithology with TBM construction data and outperformed the conventional LSTM network and other models in accuracy and F1-scores. The results could help the TBM drivers to adjust the operational parameters at real time for high-efficient tunnel construction. With implementation of the establish model into the TBM operational system, we will develop intelligence construction mode for the long TBMconstructed hard rock tunnels.
更多
查看译文
关键词
Rock engineering, Tunnel boring machine tunnel, Global attention mechanism, Long short-term memory network, Construction big data, Intelligent lithology prediction
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要