Nash equilibrium solutions in multi-agent project scheduling with milestones

European Journal of Operational Research(2021)

引用 4|浏览1
暂无评分
摘要
•The paper studies presence of milestones in a multi-agent project scheduling.•We analyze the problem complexity.•The suggested algorithm is based on a lazy-constraint generation technique.•We investigate the role of milestones to drive the project to the owner’s goal.
更多
查看译文
关键词
Project scheduling,Nash equilibria,Flow networks,Milestones,Lazy-constraint generation
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要