Multi-Mode Rcpsp With Safety Margin Maximization: Models And Algorithms

PROCEEDINGS OF THE 10TH INTERNATIONAL CONFERENCE ON OPERATIONS RESEARCH AND ENTERPRISE SYSTEMS (ICORES)(2021)

引用 0|浏览6
暂无评分
摘要
We study here a variant of the multimode Resource Constrained Project Scheduling problem (RCPSP), which involves continuous modes, and a notion of Safety Margin maximization. Our interest was motivated by a work package inside the GEOSAFE H2020 project, devoted to the design of evacuation plans in face of natural disasters, and more specifically wildfire.
更多
查看译文
关键词
Scheduling, Resource Constrained Project Scheduling Problem, Evacuation Process, Network Flow, Branch and Bound, Linear Programming
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要