Analysis Of Road Capacity And Franchise Price Decision Delegation In Toll Road Bot Project

TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW(2021)

引用 5|浏览3
暂无评分
摘要
This paper studies four Build-Operate-Transfer (BOT) models that the government is a leader, and the private sector is a follower. They decide road capacity and franchise price either jointly or sequentially. We find that both the government and the private sector prefer to decide the franchise price. Social welfare can be maximized if the government decides the price, and the private sector decides capacity. We further find that the private sector does not always prefer a more extended franchise period, and the profit of the private sector is concave in the length of the concession period. Nevertheless, the government prefers a more extended concession period because of the inefficient operation cost.
更多
查看译文
关键词
BOT project, Toll road, Optimal contract
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要