Performance evaluation and decision making for pre-decision remanufacturing timing with on-line monitoring

Journal of Cleaner Production(2021)

引用 4|浏览15
暂无评分
摘要
Most remanufacturing cores are obtained from end-of-life products with variable failure condition, and uncertainties in these cores are issues about product remanufacturing. In this study, considering the connotation of Pre-decision remanufacturing, the decision-making method for remanufacturing timing is presented with an evaluation of product performance based on the structural failure in key components by on-line monitoring. First, the operating performance is discussed with different considerations for remanufacturing timing; meanwhile, the structural failure procedure is identified as the foundation of performance evaluation, and the mapping model of operating performance, remanufacturability, and structural failure condition is presented. Second, the failure condition in key components that is set as the indicator of Pre-decision remanufacturing timing and obtained by optimizing economic and environmental considerations is identified on the basis of the mapping relationship between structural failure and sensor signal. Finally, the Pre-decision remanufacturing timing of the crankshaft in diesel engine is analyzed to validate the effectiveness and feasibility of the method.
更多
查看译文
关键词
Remanufacturing timing,Decision making,Pre-decision remanufacturing,Performance evaluation,On-line monitoring
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要