A Bi-objective Scheduling Model for Additive Manufacturing with Multiple Materials and Sequence-Dependent Setup Time.

APMS (2)(2020)

引用 5|浏览1
暂无评分
摘要
Considering the striking achievement of additive manufacturing (AM) as a revolutionary technology, it has increasingly attracted the attention of academia and industrial communities in recent years. Scheduling and production planning in AM play an essential role in the efficient and economical manufacturing of customized products through the saving of time and cost. In this paper, an AM scheduling problem is taken into account with different order specifications, especially the material type and due date on non-identical parallel machines. To formulate the problem, a bi-objective mixed-integer linear programming (MILP) model is proposed to minimize the makespan and the total tardiness penalty. Assuming parts with different material types necessitates the consideration of sequence-dependent setup time that depends on the material type of the current and previous jobs on an AM machine. Finally, an augmented E-constraint method is applied for the problem to achieve a Pareto-optimal front in an illustrative instance.
更多
查看译文
关键词
additive manufacturing,multiple materials,bi-objective,sequence-dependent
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要