Variation of Rock Mass Pressure during Tunnel Construction in Phyllite Stratum

MATHEMATICAL PROBLEMS IN ENGINEERING(2020)

引用 3|浏览12
暂无评分
摘要
In this paper, the field monitoring method is used to study the variation of rock mass pressure during the construction of a tunnel in phyllite stratum, and three functions are used to fit and analyze the variation of rock mass pressure with deformation, excavation time, and space. The results show the following (1) When the deformation increases significantly, the rock mass pressure decreases firstly and then increases. This is caused by the insufficient bearing capacity of the rock mass in the arch foot of the supporting structure after the excavation of the upper bench, which leads to a settlement of supporting structure and surrounding rock. (2) Compared with other kinds of fitting functions, the logistic function can better characterize the variation of the pressure of surrounding rock with deformation, excavation time, and distance from the face. This paper provides a reliable reference for the design and construction of the tunnel in phyllite stratum. The logistic function can be used to present and predict the change of rock mass pressure with deformation, excavation time, and space in similar rock mass conditions.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要