Column generation for minimizing total completion time in a parallel-batching environment

JOURNAL OF SCHEDULING(2021)

引用 7|浏览7
暂无评分
摘要
This paper deals with the 1|p-batch, s_j≤ b|∑ C_j scheduling problem, where jobs are scheduled in batches on a single machine in order to minimize the total completion time. A size is given for each job, such that the total size of each batch cannot exceed a fixed capacity b . A graph-based model is proposed for computing a very effective lower bound based on linear programming; the model, with an exponential number of variables, is solved by column generation and embedded into both a heuristic price and branch algorithm and an exact branch and price algorithm. The same model is able to handle parallel-machine problems like Pm|p-batch, s_j≤ b|∑ C_j very efficiently. Computational results show that the new lower bound strongly dominates the bounds currently available in the literature, and the proposed heuristic algorithm is able to achieve high-quality solutions on large problems in a reasonable computation time. For the single-machine case, the exact branch and price algorithm is able to solve all the tested instances with 30 jobs and a good amount of 40-job examples.
更多
查看译文
关键词
Price and branch, Column generation, Parallel batching, Scheduling
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要