A hybrid model to assess the hydropower potential for rivers

International Journal of Hydrology Science and Technology(2020)

引用 0|浏览9
暂无评分
摘要
A computer program called hydropower plant site assessment program (HPSAP) was developed by using Visual Basic programming to assess the hydropower potential in river basins. A methodology to select the best site to install the hydropower plant was developed according to meteorological, hydrological and economical design criteria. HPSAP has several options to analyse watersheds for different head or power criteria. HPSAP estimates the locations coordinate and upstream drainage area for powerhouse and weir locations, elevation of powerhouse and weir, the distance between weir site and powerhouse site, penstock length, design head and power for proposed plants. The design discharge is estimated by using a flow duration curve regression equation developed by group method of data handling (GMDH) based on rainfall-runoff model outputs. The hydrological engineering centre-hydrological modelling system (HEC-HMS) model was used as the hydrological rainfall-runoff model in this study. The results have proven the ability of the program to assess the hydropower potential in river basins.
更多
查看译文
关键词
run-of-river hydropower plant, flow duration curve, FDC, Visual Basic programming, hydropower program, hydrological engineering centre-hydrological modelling system, HEC-HMS, group method of data handling, GMDH
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要