The Development and Application of Electric Sealing Pliers

PROCEEDINGS OF THE 2017 5TH INTERNATIONAL CONFERENCE ON MACHINERY, MATERIALS AND COMPUTING TECHNOLOGY (ICMMCT 2017)(2017)

引用 0|浏览11
暂无评分
摘要
According to the national requirements of the Power Grid Corp, Our company will replace the existing single-phase into single phase electric meter of intelligent rate controlling, in order to achieve the function of remote meter reading. Customer service center measurement room needs to undertake the task of verifying the about eight hundred thousand electric meter that makes the calibration personnel in inspection test class need to complete three hundred electric energy meter calibration and six hundred sealing work every day. Because the speed of the sealing speed has a direct impact on the completion of a large number of calibration tasks, we developed the electric sealing pliers to ensure the completion of a large number of calibration tasks.
更多
查看译文
关键词
single phase electric meter of intelligent rate controlling,remote meter reading,electric sealing pliers
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要