Coordination of Production Scheduling and Vehicle Routing Problem with Due Dates.

ADVANCES IN INDUSTRIAL AND APPLIED MATHEMATICS(2016)

引用 7|浏览9
暂无评分
摘要
This work presents a study on a problem of production and distribution planning. The problem considers a make-to-order production-distribution system with one manufacturer and many customers. The manufacturer (at the depot) produces the products once customer orders have been received. Distributions to the customers associated with a set of orders should be done before the customer's due date to avoid any penalty for delay. The problem is the extension of the Vehicle Routing Problem with Release and Due Dates (VRPRDD) where deliveries start depending on the fix release dates. To achieve optimum efficiency in planning, it makes sense to coordinate production schedule with distribution planning. This is the subject of this study. The classical approach which treats these two planning sequentially is proposed, in which VNS is used as optimization method since it shows to be the most competent heuristic in the VRPRDD. The results shown that integrating production schedule and routing vehicle is significantly better compared to VRPRDD.
更多
查看译文
关键词
production scheduling,vehicle routing problem
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要