Cognition-Based Delay Analysis To Determine The Average Minimum Time Limit For Wireless Sensor Communications
IEICE TRANSACTIONS ON INFORMATION AND SYSTEMS(2020)
摘要
End-to-end delay, aiming to realize how much time it will take for a traffic load generated by aMobile Node (MN) to reach Sink Node (SN), is a principal objective of most new trends in a Wireless Sensor Network (WSN). It has a direct link towards understanding the minimum time delay expected where the packet sent by MN can take to be received by SN. Most importantly, knowing the average minimum transmission time limit is a crucial piece of information in determining the future output of the network and the kind of technologies implemented. In this paper, we take network load and transmission delay issues into account in estimating the Average Minimum Time Limit (AMTL) needed for a health operating cognitive WSN. To further estimate the AMTL based on network load, an end-to-end delay analysis mechanism is presented and considers the total delay (service, queue, ACK, and MAC). This work is proposed to answer the AMTL needed before implementing any cognitive based WSN algorithms. Various time intervals and cogitative channel usage with different application payload are used for the result analysis. Through extensive simulations, our mechanism is able to identify the average time intervals needed depending on the load and MN broadcast interval in any cognitive WSN.
更多查看译文
关键词
broadcast load balancing, delay, cogitative, interference, wireless sensor network
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要