Short-Term Production Scheduling With Non-Triangular Sequence-Dependent Setup Times And Shifting Production Bottlenecks

Joost Berkhout,Eric Pauwels,Rob van der Mei, Jan Stolze, Siem Broersen

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH(2021)

引用 5|浏览5
暂无评分
摘要
A novel mathematical model is introduced that allows solving real-life scheduling problems in complex multi-stage machine environment with (i) non-triangular sequence-dependent setup times and (ii) shifting production bottlenecks, both of which are important aspects appearing in varying manufacturing industries. The primary goal is to minimise the tardiness of customer orders, which may consist of multiple production orders each in turn composed of several batches. A secondary objective is to maximise the production capacity utilization as measured by the makespan. The model is elaborated for general animal-feed plants which have to deal with the particular production scheduling problem on a daily basis. Dispatching rules are introduced to enhance the optimization progress. Numerical experiments show that optimising the model leads to schedules that meet the due dates. Moreover, by reducing the mean idle time of production lines with 35.6%, the optimization leads to a makespan reduction of 6.5% on average compared to real-life applied schedules.
更多
查看译文
关键词
scheduling, production scheduling, non-triangular sequence-dependent setup times, shifting production bottlenecks, animal-feed industry
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要