New Insights into Timber-Framing in Shropshire: Findings from the Tilley Timber Project

Andy Moir,George Nash, Alastair Reid

VERNACULAR ARCHITECTURE(2019)

引用 1|浏览0
暂无评分
摘要
The Tilley Timber Project accurately dated 21 buildings with a total of 33 phases of development by tree-ring analysis in and around Tilley, a small village in north Shropshire. A spike of timber construction in Tilley when decorative wall-framing was at its height is identified. Using this data together with 261 previously published tree-ring dates, the datable changes in the style of timber-framing across the county are summarised and some of the possible causes discussed.
更多
查看译文
关键词
Dendrochronology,historic buildings,oak,timber,Shropshire
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要