Deadtime Impact on the small-signal output impedance of Single-Phase Power Electronic Converters
2019 20th Workshop on Control and Modeling for Power Electronics (COMPEL)(2019)
摘要
The deadtime is an important factor in the design of power-electronic converters in order to prevent shoot-through faults. The deadtime may also cause a voltage error and an undesired damping effect which, in turn, affect the converter stability. As most effects caused by the deadtime are highly nonlinear, conventional modeling techniques to analyze these effects cannot be straightforwardly applied. This paper proposes a novel frequency-domain approach to model the damping effect caused by the deadtime in single-phase half-bridge inverters. Hardware-in-the-loop (HIL) simulations and laboratory measurements are presented and used to demonstrate the effectiveness of the proposed method.
更多查看译文
关键词
frequency response,deadtime,damping
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要