Robust and stable multi-task manufacturing scheduling with uncertainties using a two-stage extended genetic algorithm.

ENTERPRISE INFORMATION SYSTEMS(2019)

引用 14|浏览1
暂无评分
摘要
In cloud manufacturing (CMfg), unexpected uncertainties can occur in real-world manufacturing processes that could make the predetermined schedule infeasible. A new multi-objective proactive method is proposed in this situation to evaluate the proactive schedule. A novel two-stage extended genetic algorithm (2S-EGA) is proposed to generate proactive schedules that consider service interruptions. The experimental results confirmed that the obtained proactive schedule produces great performance when applied to multi-task scheduling problems with service interruptions. Furthermore, the results also showed that the proactive schedule obtained by the proposed approach is more robust and stable than other baseline algorithms taken from the literature.
更多
查看译文
关键词
CMfg,flexible multi-task scheduling,uncertainties,robustness and stability,proactive schedule,2S-EGA
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要