Progress in the ITER neutral beam test facility

Vanni Toigo,Samuele Dal Bello,Marco Bigi,Marco Boldrin,Giuseppe Chitarin,Luca Grando,Adriano Luchetta,Diego Marcuzzi,Roberto Pasqualotto,Nicola Pomaro,Gianluigi Serianni,Pierluigi Zaccaria,Loris Zanotto,Piero Agostinetti,Matteo Agostini,Vanni Antoni,Daniele Aprile,Marco Barbisan,Manuela Battistella,Matteo Brombin,Roberto Cavazzana,Mauro Dalla Palma,Mattia Dan,Sylvestre Denizeau,Antonio De Lorenzi,Rita Delogu,Michela Demuri,Michele Fadone,Francesco Fellin,Alberto Ferro,Elena Gaio, Francesco Gnesotto,Palak Jain,Alberto Maistrello,Roberto Piovan, Giorgio Rostagni,Piergiorgio Sonato,Matteo Valente,Andrea Zamengo, Deirdre Boilson, Chandramouli Rotti,Pierluigi Veltri,Julien Chareyre,Hans Decamps,Matthias Dremel, Joseph Graceffa, Francois Geli, Beatrix Schunke,Lennart Svensson,Marc Urbani,Tullio Bonicelli, Gilbert Agarici, A Garbuglia,Antonio Masiello,Francesco Paolucci,Muriel Simon, Laurent Bailly-Maitre,Eduard bragulat, Gerard Gomez,Daniel Gutierrez,Carmelo Labate, Gonzalo Mico, Juan Moreno, Vincent Pilard, Grigory Kouzmenko, Aurelien Rousseau,Mieko Kashiwagi,Hiroyuki Tobari,Kazuhiro Watanabe,Tetsuya Maejima,Atsushi Kojima,Naotaka Umeda, Shunichi Sasaki,Arun Chakraborty, Ujjwal K Baruah,Hitesh kumar K Patel,Narinder Singh,Amit Patel,Hitesh Dhola, Bhavin Raval,Vikrant Gupta,Bernd Heinemann,Ursel Fantz,Werner Kraus,Marco Cavenago,Stefan Hanke, Santiago Ochoa,Peter Blatchford, Ben Chuilon,Yong Xue,Gabriele Croci,Giuseppe Gorini,Andrea Muraro,Marco Tardocchi,Marika Rebai,Marco D'Arienzo,Sandro Sandri,Andrea Tonti, Francesco Panin

NUCLEAR FUSION(2019)

引用 47|浏览146
暂无评分
摘要
Heating neutral beam (HNB) injectors, necessary to achieve burning conditions and to control plasma instabilities in ITER, are characterized by such demanding parameters that a neutral beam test facility (NBTF) dedicated to their development and optimization is being realized in Padua (Italy) with direct contributions from the Italian government (through Consorzio RFX as the host entity) and the ITER international organization (with kind contributions from the ITER domestic agencies of Europe, Japan and India) and technical and scientific support from various European laboratories and universities. The NBTF hosts two experiments: SPIDER, devoted to ion source optimization for the required source performance, and MITICA, the full-size prototype of the ITER HNB, with an ion source identical to SPIDER. This paper gives an overview of the progress towards NBTF realization, with particular emphasis on issues discovered during this phase of activity and on solutions adopted to minimize the impact on the schedule and maintain the goals of the facilities. The realization of MITICA is well advanced; operation is expected to start in 2023 due to the long procurement time of the in-vessel mechanical components. The beam source power supplies, operating at 1 MV, are in an advanced phase of realization; all high-voltage components have been installed and the complex insulation test phase began in 2018. At the same time, construction and installation of SPIDER plant systems was successfully completed with their integration into the facility. The mechanical components of the SPIDER ion source were installed inside the vessel and connected to the plants. Integrated commissioning with the control, protection and safety systems ended positively and the first experimental phase has begun. The first results of the SPIDER experiment, with data from operational diagnostics, and the plans for the 1 MV insulation tests on the MITICA high-voltage components are presented.
更多
查看译文
关键词
ITER,neutral beam injector,PRIMA: the ITER neutral beam test facility (NBTF),SPIDER
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要