A sampling approach for proactive project scheduling under generalized time-dependent workability uncertainty

Hosted Content(2019)

引用 13|浏览47
暂无评分
摘要
AbstractIn real-world project scheduling applications, activity durations are often uncertain. Proactive scheduling can effectively cope with the duration uncertainties, by generating robust baseline solutions according to a priori stochastic knowledge. However, most of the existing proactive approaches assume that the duration uncertainty of an activity is not related to its scheduled start time, which may not hold in many real-world scenarios. In this paper, we relax this assumption by allowing the duration uncertainty to be time-dependent, which is caused by the uncertainty of whether the activity can be executed on each time slot. We propose a stochastic optimization model to find an optimal Partial-order Schedule (POS) that minimizes the expected makespan. This model can cover both the time-dependent uncertainty studied in this paper and the traditional time-independent duration uncertainty. To circumvent the underlying complexity in evaluating a given solution, we approximate the stochastic optimization model based on Sample Average Approximation (SAA). Finally, we design two efficient branch-and-bound algorithms to solve the NP-hard SAA problem. Empirical evaluation confirms that our approach can generate high-quality proactive solutions for a variety of uncertainty distributions.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要