New results for single-machine scheduling with past-sequence-dependent setup times and due date-related objectives

European Journal of Operational Research(2019)

引用 9|浏览4
暂无评分
摘要
•We consider past-sequence-dependent setup times with due date-related objectives.•We solve the maximum lateness and maximum tardiness problems in quadratic time.•We solve the minimum number of tardy jobs problem in quadratic time.•We solve the total weighted tardiness and weighted number of tardy jobs problems.
更多
查看译文
关键词
Scheduling,Single-machine,Setup times