An adaptive CGAN/IRF-based rescheduling strategy for aircraft parts remanufacturing system under dynamic environment

Robotics and Computer-Integrated Manufacturing(2019)

引用 34|浏览9
暂无评分
摘要
•A data-driven adaptive rescheduling strategy is proposed.•Hybrid triggering mechanism to response frequent gradual disruptions.•Conditional generative adversarial networks for class-imbalanced data set.•Improved random forest as a classifier for rescheduling method.
更多
查看译文
关键词
Aircraft parts remanufacturing system,Dynamic environment,Rescheduling,Improved random forest
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要