A vendor-buyer inventory model with lot-size and production rate dependent lead time under time value of money

RAIRO-OPERATIONS RESEARCH(2020)

引用 14|浏览3
暂无评分
摘要
The paper studies an integrated vendor-buyer model with shortages under stochastic lead time which is assumed to be variable but depends on the buyer's order size and the vendor's production rate. The replenishment lead time and the market demand uncertainty are assumed to be reduced by changing the regular production rate of the vendor at the risk of paying additional cost. Shortages are partially backlogged and the backlogging rate depends on the length of the buyer's replenishment lead time. The proposed model is formulated to obtain the net present value (NPV) of the expected total cost of the integrated system through optimization of (i) the buyer's order quantity, (2) the buyer's safety factor, and (3) the vendor's production rate. Theoretical results are derived to demonstrate the existence and uniqueness of the optimal solution. Through extensive numerical study, some valuable managerial insights are obtained.
更多
查看译文
关键词
Supply chain,variable production rate,NPV method,lead time reduction,backordering,demand uncertainty
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要