Improving Effectiveness Of Parallel Machine Scheduling With Earliness And Tardiness Costs: A Case Study

INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS(2019)

引用 5|浏览4
暂无评分
摘要
This paper assesses the effectiveness in scheduling independent jobs with earliness/tardiness costs and variable setup times applying the Overall Equipment Effectiveness (OEE). The OEE is a common metric for measuring the manufacturing productivity. We defined a mixed-integer linear programming formulation of the parallel machine scheduling problem with four different objective functions in order to compare different scheduling configurations. Real data, from a plastic container manufacturing company located in the Basque Country (Spain), were used to validate this approach. A sensitivity analysis was performed with different production capacities and earliness/tardiness costs in order to evaluate the trade-offs between economic performance (i.e., costs) and the partial rates of OEE (i.e., quality, performance and availability). The objective of this study is to propose a guideline to help management make decisions regarding the measurement and improvement of scheduling effectiveness through contemplating earliness, tardiness and variable setup times. (C) 2019 by the authors; licensee Growing Science, Canada
更多
查看译文
关键词
Production scheduling, Earliness/tardiness, OEE, Optimization, Multi-objective, KPI's
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要