Multi-stage equilibrium in electricity pool with flexible ramp market

International Journal of Electrical Power & Energy Systems(2019)

引用 20|浏览3
暂无评分
摘要
•Inter-temporal nature of the problem entails application of a dynamic game model.•Uncertainties are tackled by a multi-stage stochastic programming.•A multi-stage stochastic bi-level equilibrium is addressed.•MILP was employed to solve a multi-stage stochastic bi-level equilibrium problem.•Considering another trading market can lead to the existence of equilibrium.
更多
查看译文
关键词
MPEC,EPEC,Flexible ramp market,Equilibrium
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要