Joint Optimization Of Maintenance Force And Spare Parts Provision For K-Out-Of-N System In Wartime

PROCEEDINGS OF 2018 IEEE 3RD ADVANCED INFORMATION TECHNOLOGY, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (IAEAC 2018)(2018)

引用 0|浏览0
暂无评分
摘要
To deal with the response delay problem of the spare part provision for equipment in wartime, a maintenance strategy is proposed considering the properties of k-out-of-n system and finite maintenance capacity. A mathematical model for the joint optimization of maintenance decision-making and spare parts provision is developed to maximize the system availability and minimize the maintenance cost simultaneously. The marginal benefit method is adopted to solve the proposed model, and the optimal declaration time of spare parts, as well as the optimal maintenance force configuration scheme is obtained.
更多
查看译文
关键词
k-out-of-n equipment system, decision-making time, joint optimization, marginal benefit method
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要