Risks assessment in thermal power plants using ISM methodology

Annals of Operations Research(2019)

引用 25|浏览14
暂无评分
摘要
This paper assesses the interrelationships between hazards/risks (considered as barriers) for the effective implementation of Occupational Health and Safety (OHS) measures using Interpretive Structural Modeling (ISM). We investigate within and among hazard/risk classes and formulate a structural model that identifies and prioritizes their levels. Mitigation strategies for the identified barriers make the research outcome more useful and applicable. Results reveal that insulation failure, barrier (B7), is the most influential hazard; hence, it must be addressed first for the effective implementation of OHS measures in coal-fired thermal power plants. The second barrier in the ISM hierarchy, (B6) fire (mill/pool/jet), and additional hazards and risks require further assessment.
更多
查看译文
关键词
Interrelationship between hazards/risks, OHS, ISM, Coal-fired thermal power plants
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要