The New DC-280 Cyclotron. Status and Road Map

Physics of Particles and Nuclei Letters(2018)

引用 3|浏览41
暂无评分
摘要
The status of the project of the DC-280 cyclotron is presented. The DC-280 will be the basic facility of the Super Heavy Element Factory which is being created at the FLNR JINR. The energy of the ions extracted from the cyclotron will be vary from 4 up to 8 MeV/amu. The expected ion beam intensity at DC-280 extraction is 10 pμA for ions with masses of 50–60. The main parts of the DC-280 are already made and are being assembled. In according to FLNR plans the cyclotron has to be assembled in the period from 2016 to 2017. The cyclotron commissioning will be in 2018.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要