Robust Optimization for the Resource Constrained Multi-Project Scheduling Problem with Uncertain Activity Durations

SCIENTIA IRANICA(2020)

引用 11|浏览6
暂无评分
摘要
This paper studies the multi-project scheduling problem that involves multiple projects with different importance weights, predefined assigned due dates, activities with uncertain durations, and renewable constrained resources. The resource sharing policy is applied to share resources among projects. Due to the environmental rapid changes and, also, the uniqueness of projects, the probability distribution function of uncertain durations cannot be estimated with confidence. Besides, the multi-project scheduling problem with its large-scale investment dictates a conservative approach to deal with the existing uncertainty. Therefore, the Robust Resource-Constrained Multi-Project Scheduling Problem (RRCMPSP) is studied in this paper, while the maximum total weighted tardiness of the projects should be minimized. A scenario-relaxation algorithm is implemented, which results in optimal solutions for the RRCMPSP. The aim is to find an optimal structure that contains all of the projects such that it transfers the resources between the activities based on the resource sharing policy, while the maximum weighted differences between the projects' finish times and their assigned due dates will be minimum. (C) 2020 Sharif University of Technology. All rights reserved.
更多
查看译文
关键词
Multi-project scheduling problem,Resource sharing policy,Robust optimization,Resource constraint,Uncertain activity duration
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要