This paper considers an optimal production scheduling problem in a single-supplier-multi-manufacturer supply chain involving production and delivery time-delays, where the time-delays for the supplier and the manufacturers can have different values. The objective of both levels is to find an optimal production schedule so that their production rates and their inventory levels are close to the ideal values as much as possible in the whole planning horizon. Each manufacturer's problem, which involves one time-delayed argument, can be solved analytically by using the necessary condition of optimality. To tackle the supplier's problem involving n+1 different time-delayed arguments (where n is the number of manufacturers) by the above approach, we need to introduce a model transformation technique which converts the original system of combined algebraic/differential equations with n + 1 time-delayed arguments into a sum of n sub-systems, each of which consists of only two time-delayed arguments. Thus, the supplier's problem can also be solved analytically. Numerical examples consisting of a single supplier and four manufacturers are solved to provide insight of the optimal strategies of both levels.
更多
查看译文
关键词
Optimal control,supply chain problem,single-supplier multi-manufacturer,time delays in the production process,multiple time delays
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要