A Hybrid Genetic Algorithm to Maximize Net Present Value of Project Cash Flows in Resource Constrained Project Scheduling Problem with fuzzy parameters

Fatemeh Fathallahi,Amir Abbas Najafi

SCIENTIA IRANICA(2016)

引用 9|浏览3
暂无评分
摘要
This paper studies a specific resource-constrained project scheduling problem under uncertainty. To do so, the problem is investigated in fuzzy environment and the goal is to maximize the net present value of the project cash flows. The problem is first mathematically formulated. Then, a hybrid Genetic Algorithm is proposed and tuned to solve this NP-hard problem. The performance of the proposed algorithm is evaluated with comparing two well-known metaheuristic algorithms through a set of instances. Finally, comprehensive computational results are illustrated and the results are analyzed and discussed. (C) 2016 Sharif University of Technology. All rights reserved.
更多
查看译文
关键词
Discounted cash flows,Net present value,Fuzzy sets,Uncertainty,Genetic algorithms
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要