摘要
Project scheduling is a major area of project management and planning. Due to the increasing prices of goods in most countries during the project and lack of information related to each parameters and variables, using fuzzy sets under inflationary condition can be efficient. In this paper, fuzzy project scheduling when project's revenues and costs are increased by different inflationary rate is considered. The duration of each project's activity is assumed as a fuzzy number. Two objectives of the problem are to minimize the project duration and to maximize the net present value of the project. The nonlinear multi-objective model will be solved by one of the multi objective decision making methods named LP-Metric method and Frank-Wolf algorithm as one of the nonlinear programming procedure. The solving approach will be explained in a numerical example and the computational results will be reported.
更多
查看译文
关键词
Fuzzy sets,Inflation,Project scheduling,Makespan,NPV
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要