Helium neutral beam injection into ASDEX Upgrade
Fusion Engineering and Design(2017)
摘要
•Pure He neutral beams were injected into ASDEX Upgrade by its NBI system.•Up to four beams can be operated regardless of discharge duration.•The maximum total injected He beam power is estimated at 2.6MW.
更多查看译文
关键词
Neutral beam injection,Helium,ASDEX Upgrade
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要