Load forecasting and dispatch optimisation for decentralised co-generation plant with dual energy storage

Applied Energy(2017)

引用 45|浏览2
暂无评分
摘要
•Open software components for load prediction and rolling horizon CHP plant optimisation are described.•Results indicated that solver overheads increased 380-fold during low heat load periods.•Solving times <1s were regained by considering differing dispatch and unit commitment horizons.•32% cost reductions were observed through balancing market interaction when load prediction inaccuracies were present.•Results indicated costs were significantly more sensitive to prediction accuracy than plant model accuracy.
更多
查看译文
关键词
Short term heat and electricity load forecasting,Decentralised Combined Heat and Power (CHP) plant optimisation,Economic dispatch,Unit commitment,Convex optimisation,Mixed Integer Linear Programming (MILP)