Delay Analysis of Fixed Multi-Thread Algorithm for DBA in Long Reach PON.
ICUFN(2018)
摘要
Long-Reach PON (LR-PON) is a broadband access network using passive optical network (PON) technology which the reach is extended to 100 km or higher. A major challenge in LR-PON is that the propagation delay between OLT and ONUs is increased by a very significant amount. We analyze the delay performance of fixed multi-thread algorithm, which is simple and efficient, for dynamic bandwidth allocation in long reach PON. Especially, the average packet delay of the expedited forwarding (EF) traffic class is analyzed. This performance analysis reveals that fixed multi-thread algorithm for DBA in long reach PON provides predictable packet delay and improved jitter performance for the EF traffic class without the influence of load variations.
更多查看译文
关键词
Broadband access network, long reach PON (LR-PON), multh-thread algorithm, dynamic bandwidth allocation
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要