How to Measure the Robustness of Shunting Plans.

ATMOS(2018)

引用 1|浏览5
暂无评分
摘要
The general problem of scheduling activities subject to temporal and resource constraints as well as a deadline emerges naturally in numerous application domains such as project management, production planning, and public transport. The schedules often have to be implemented in an uncertain environment, where disturbances cause deviations in the duration, release date or deadline of activities. Since these disruptions are not known in the planning phase, we must have schedules that are robust, i.e., capable of absorbing the disturbances without large deteriorations of the solution quality. Due to the complexity of computing the robustness of a schedule directly, many surrogate robustness measures have been proposed in literature. In this paper, we propose new robustness measures, and compare these and several existing measures with the results of a simulation study to determine which measures can be applied in practice to obtain good approximations of the true robustness of a schedule with deadlines. The experiments are performed on schedules generated for real-world scheduling problems at the shunting yards of the Dutch Railways (NS).
更多
查看译文
关键词
robustness
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要