Review of investment model cost parameters for VSC HVDC transmission infrastructure

Electric Power Systems Research(2017)

引用 37|浏览6
暂无评分
摘要
•Cost parameters for VSC HVDC systems gathered from extensive collection of sources.•Comparison of investment cost parameter sets reveals large variations.•Validation against comprehensive cost reference project data shows big uncertainty.•Reliable cost reference data and valid cost parameters need continuing attention.
更多
查看译文
关键词
Offshore grids,Transmission expansion planning,Cost model,HVDC,VSC
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要