New index priority rules for no-wait flow shops.

Computers & Industrial Engineering(2018)

引用 15|浏览11
暂无评分
摘要
•We propose index priority rules for no-wait flow shops.•We consider specially-structured job processing times.•We generalize previous rules for the minimum makespan objective.•We propose a new rule for the weighted total job completion time objective.
更多
查看译文
关键词
Scheduling,Flow shop,No-wait
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要