A Decisional Framework for Concurrent Planning of Multiple Projects and Supply Chain Network

Lecture Notes in Business Information Processing(2018)

引用 2|浏览12
暂无评分
摘要
This paper studies a problem for planning a set of projects integrated with a closed-loop supply chain. It aims at presenting a web-based application that is developed to support the solving procedure of the problem while going through some user-friendly interfaces. The mathematical model of the study considers scheduling for projects' renewable and non-renewable resources. The renewable resources are available in an initial quantity. Nevertheless, their availability may increase by renting additional limited amounts. Considering due-dates that are given to the projects' activities, the model attempts to define equilibrium between the costs for adding the resources and penalty costs originated from activities late completion. In order to plan the procurement of the non-renewable resources and also management of wastes produced at the worksites, planning of a closed-loop supply chain is integrated into scheduling of the projects. The model is applied on a case from a French project called CRIBA.
更多
查看译文
关键词
Multi project scheduling problem,Supply chain planning,Mixed integer programming,Web-based decision support systems
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要