Solving Resource-Constrained Project Scheduling Problems Using Hybrid Artificial Bee Colony with Differential Evolution

JOURNAL OF COMPUTING IN CIVIL ENGINEERING(2016)

引用 20|浏览17
暂无评分
摘要
Solving resource-constrained (RC) project scheduling problems is one the most important tasks in the project planning process. This study presents a new hybrid approach, named Artificial Bee Colony with Differential Evolution, to handle resource-constrained problems (ABCDE-RC). The proposed algorithm integrates crossover operations from differential evolution (DE) with original artificial bee colony (ABC) to balance exploration and exploitation phases of the optimization process. Furthermore, this study applies a serial method to reflect individual-vector priorities into the active schedule to calculate project duration. The ABCDE-RC algorithm is compared with benchmark algorithms considered using a real construction case study and a set of standard problem available in the literature. The experimental results demonstrate the efficiency and effectiveness of the proposed model. The ABCDE-RC is a promising alternative approach to handling resource-constrained project scheduling problems.
更多
查看译文
关键词
Resource-constrained,Artificial bee colony,Differential evolution,Construction management
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要