Time-inconsistent contract theory

MATHEMATICAL FINANCE(2023)

引用 23|浏览3
暂无评分
摘要
This paper investigates the moral hazard problem in finite horizon with both continuous and lump-sum payments, involving a time-inconsistent sophisticated agent and a standard utility maximizer principal: Building upon the so-called dynamic programming approach in Cvitanic et al. (2018) and the recently available results in Hernandez and Possamai (2023), we present a methodology that covers the previous contracting problem. Our main contribution consists of a characterization of the moral hazard problem faced by the principal. In particular, it shows that under relatively mild technical conditions on the data of the problem, the supremum of the principal's expected utility over a smaller restricted family of contracts is equal to the supremum over all feasible contracts. Nevertheless, this characterization yields, as far as we know, a novel class of control problems that involve the control of a forward Volterra equation via Volterra-type controls, and infinite-dimensional stochastic target constraints. Despite the inherent challenges associated with such a problem, we study the solution under three different specifications of utility functions for both the agent and the principal, and draw qualitative implications from the form of the optimal contract. The general case remains the subject of future research. We illustrate some of our results in the context of a project selection contracting problem between an investor and a time-inconsistent manager.
更多
查看译文
关键词
backward stochastic Volterra integral equations,consistent planning,dynamic utilities,moral hazard,portfolio selection,sophisticated agent,stochastic target,time-inconsistency
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要