Automated Organization Production And Mounting Of Glass Curtain Walls

M M Kalyuzhnyuk,A V Kalyuzhnyuk

MAGAZINE OF CIVIL ENGINEERING(2013)

引用 1|浏览0
暂无评分
摘要
At present the automation of organizational design and organizational preparation of building production is based mainly on the outdated methods. Solution of this requires the development of effective methods of technical regulation and construction scheduling.Authors use methods of technical regulation and scheduling, previously obtained in structural-functional modeling theory, for production and mounting of glass curtain walls. The article shows the application of these standards in determining the time of producing series of glass facade elements for particular building sites, as well as in the synchronized scheduling production and mounting of these structures.Authors claim that suggested methods can be used for organizational design and organizational preparation of any other construction processes. Received data can be used to create databases of organization standards of labor and time inputs for production.
更多
查看译文
关键词
work operations, simple technological processes, methods of scheduling, parallel-flow methods, technical regulation, automation of pre-production, organizational design
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要